Skip to content
Snippets Groups Projects
Commit b20012da authored by arnolda2's avatar arnolda2
Browse files

Update README.md

parent 7ff019f8
No related branches found
No related tags found
1 merge request!6Update README.md
......@@ -14,13 +14,9 @@ Got the guidelines for project proposal, and worked on project proposal.
## 2/8/2024 and 2/9/2024
Objective is to figure out what sensors to use for our project and finish project proposal and team contract. \
Started looking around for sensors, narrowed it down to pH and temperature. \
Looking for Chlorine sensors, but it is out of the budget of our project. \
Submitted project proposal and worked on and submitted team contract.\
Started looking around for sensors, narrowed it down to pH and temperature. Looking for Chlorine sensors, but it is out of the budget of our project. Submitted project proposal and worked on and submitted team contract.\
Had the intial conversation with the machine shop, to talk about our project ideas,\
said it was possible to fabricate the dispenser and gave us ideas how we could go about it\
got contact information.
Had the intial conversation with the machine shop, to talk about our project ideas, said it was possible to fabricate the dispenser and gave us ideas how we could go about it got contact information.
## 2/11/2024 and 2/12/2024
......@@ -58,7 +54,7 @@ Started working on design document.
Objective was to finsih design document and redo project proposal. \
Finished and submitted design document. \
Redid and submitted proposal for proposal regrade.\
Got one resposne with a pH meter, but no one has access to a chlorine sensor.\
Got one resposne with a pH meter from Dr. Qi of Water Engineering department, but no one has access to a chlorine sensor.\
## 2/26/2024
Objective is to have weekly TA meeting and provide updates. \
......@@ -69,12 +65,18 @@ departments and professors.
## 2/27/2024
Objective is to figure out what to do about the chlorine sensor, and have a good design review. \
No one still had a chlorine sensor, was unsure if pH meter would work.\
As it was a very expensive meter that could collect the pH value but would not be able\
to integrate it into our project.\
Dr. Qi said pH meter he has is a WTW Handheld Meter, pH/Oxi 340i, but it is 10/15 years old. \
As it was a very expensive meter that could collect the pH value but would not be able to integrate it into our project.\
Had our design review at 11am with Professor Schuh, went decently.\
Decided chlorine sensor was too expensive and too far out of the budget of the project.\
Amazon. Amazon.Com: TDS Sensor, www.amazon.com/. Accessed 1 May 2024.
Amazon. Amazon.Com: TDS Sensor, www.amazon.com/. Accessed 1 May 2024. \
Dr. Qi also provided some other suggestions linked below, based on lab work. \
[pH Meter Manual](https://www.manualslib.com/manual/1532124/Wtw-Ph-Oxi-340i.html?page=3#manual) \
[pH Meter](https://www.coleparmer.com/search?searchterm=wtw+ph+meter) \
[Chlorine Sensor](https://www.hach.com/search?keywords=chlorine+pillows&fn1=parameter&fv1=Chlorine&fn2=application&fv2=Potable+Water) \
[Chlorine Sensor Option](https://www.hach.com/search?keywords=chlorine+sensor&fn1=marketClass&fv1=Municipal) \
[Turbidity Option](https://www.hach.com/search?keywords=turbidity) \
[Chlorine Analyzer](https://www.hach.com/p-cl17sc-colorimetric-chlorine-analyzers/8572700)
## 3/3/2024 - 3/5/2024 (Before Spring Break)
Objective was to meet with TA and discuss and finalize new sensor. \
......@@ -627,7 +629,7 @@ level requirements.
## 4/24/2024 - 4/26/2024
Objective was to prepare for the mock presentation \
Made presentation slides, and started figuring out what to present and what we needed for presentation. \
[Link](https://gitlab.engr.illinois.edu/rc18/ece445-notebook/-/blob/main/notebooks/arnold/UIUC-ECE445_Final__2_.pdf?ref_type=heads)
[Presentation Slides](https://gitlab.engr.illinois.edu/rc18/ece445-notebook/-/blob/main/notebooks/arnold/UIUC-ECE445_Final__2_.pdf?ref_type=heads)
## 4/26/2024
Objective was to do well on the mock presentation and get good feedback from the communication team. \
......@@ -648,4 +650,4 @@ which we were able to answer.
## 4/30/2024 - 5/1/2024
Objective was to work on, finish, and submit the final paper. \
Worked on final paper, and submitted on 5/1. Then prepared for lab checkout tomorrow. \
[Link](https://gitlab.engr.illinois.edu/rc18/ece445-notebook/-/blob/main/notebooks/arnold/ECE445_Final_Report.pdf?ref_type=heads)
\ No newline at end of file
[Final Paper](https://gitlab.engr.illinois.edu/rc18/ece445-notebook/-/blob/main/notebooks/arnold/ECE445_Final_Report.pdf?ref_type=heads)
\ No newline at end of file
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment