- Apr 28, 2021
-
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
-
- Apr 26, 2021
-
-
Daniel R. MacLean authored
Added solid LED part back into LED-GMS-light-guide.stl and added height to the isolating walls surrounding the light guide entrance at the top of the detector.
-
Daniel R. MacLean authored
-
- Apr 25, 2021
-
-
Daniel R. MacLean authored
Added tertiary intermediate SD above the parabolic refelctor, in order to account for photons that artificially escape through the photodiode gap then ricochet directly back downwards off of the roof of the RPD.
-
- Apr 22, 2021
-
-
Daniel R. MacLean authored
Fixed issue w/orientation of GPS in beam.mac + fixed new overlap in DetectorConstruction.cc due to new wall in .stl model.
-
Daniel R. MacLean authored
Added buffer/reflector into light guide CAD model to prevetnphotons from becoming trapped between the PCB & the RPD front cover.
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
Adjustments to LED GMS light guide STL file. Adjustments to beam.mac to remove x-asymmetry of photon distribution seen in IntSD1.
-
- Apr 21, 2021
-
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
Updated light guide CAD model (.stl) with adjustments to parabolic reflector. Also adjusted position of GPS in beam.mac.
-
- Apr 19, 2021
-
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
Temporarily removed fiber definition & placement from DetectorConstruction.cc to test whether this improves light guide efficiency (i.e. LG is now 100% air).
-
- Apr 15, 2021
-
-
Daniel R. MacLean authored
-
Daniel R. MacLean authored
Updated .stl file for LED system light guide: added parameterized parabolic reflector model + accurate representation of the SMD LED we will use.
-
- Apr 14, 2021
-
-
Daniel R. MacLean authored
-
- Apr 07, 2021
-
-
Daniel R. MacLean authored
Fixed overlaps of intermediate SDs w/the light guide structure. Re-sized SDs & better aligned upper SD (#1) with the fiber array.
-
Daniel R. MacLean authored
Resized intermediate SDs for overlap testing; has to push to rebuild on differet machine (UI does not run on lab desktop).
-
- Apr 06, 2021
-
-
Chad Lantz authored
-
Chad Lantz authored
-
- Apr 05, 2021
-
-
Daniel R. MacLean authored
Fixed error w/CHECK_OVERLAPS flag(s) added to intermediate sensitive detectors (flag was not declared in scope).
-
Daniel R. MacLean authored
Set CHECK_OVERLAPS flag to 'true' & added CHECK_OVERLAPS flag to placement commands of all three sensitive detectors.
-
Daniel R. MacLean authored
-
- Mar 31, 2021
-
-
Chad Lantz authored
-
Chad Lantz authored
-
Daniel R. MacLean authored
-
Chad Lantz authored
-
Chad Lantz authored
-
Chad Lantz authored
-
- Mar 29, 2021
-
-
Daniel R. MacLean authored
-
- Mar 25, 2021
-
-
Chad Lantz authored
-
Chad Lantz authored
-
- Mar 23, 2021
-
-
Chad Lantz authored
-
- Mar 10, 2021
-
-
Chad Lantz authored
Replaced kapton definition from NIST manager to manual definition to avoid error adding MPT to material
-
- Mar 09, 2021
-
-
Chad Lantz authored
-
- Mar 08, 2021
-
-
Chad Lantz authored
-
- Feb 24, 2021
-
-
Chad Lantz authored
-