-
- Downloads
[SPARK-18846][SCHEDULER] Fix flakiness in SchedulerIntegrationSuite
There is a small race in SchedulerIntegrationSuite. The test assumes that the taskscheduler thread processing that last task will finish before the DAGScheduler processes the task event and notifies the job waiter, but that is not 100% guaranteed. ran the test locally a bunch of times, never failed, though admittedly it never failed locally for me before either. However I am nearly 100% certain this is what caused the failure of one jenkins build https://amplab.cs.berkeley.edu/jenkins/job/SparkPullRequestBuilder/68694/consoleFull (which is long gone now, sorry -- I fixed it as part of https://github.com/apache/spark/pull/14079 initially) Author: Imran Rashid <irashid@cloudera.com> Closes #16270 from squito/sched_integ_flakiness.
Please register or sign in to comment